1)  Many more signs still need to be put up.  We could use some more grade stakes.  
 
2)  Bridge from Club House to Route 9 needs to have center boards put on it to protect from the studs and the drag.  It was mentioned that a lot of time, the pipe drags pull this up.  There could also be some more signs put up approaching the bridge from the Rt 9 side and heading toward it from the Club House side.  (Caution signs, etc.)  As of Dec. 2009, the closesst, right support beam has snapped off and needs replacing. 
 
 
 
3)  The stream on the NY side of Blanchard Road needs at least a pallet or two placed across it, this is closer to Blanchard Road, before you get to the bridge. 
 
 
4)  We may need to build a bridge on the powerline behind the Fair Grounds, as the trail through the woods is now closed for some reason?  Note from 2008, still valid?